Compare foundation options without choosing by habit
Frame slab, crawlspace, basement, pier, and specialized concepts around site and building constraints.
Direct answer
Foundation selection starts with soil, groundwater, frost, flood, slope, loads, access, climate, and local practice. A floor-plan application can compare footprints and quantities, but only site investigation and qualified design can select and size the foundation.
Planning workflow
- Record known site hazards, elevations, drainage, utilities, and geotechnical information.
- List building loads, levels, mechanical needs, accessibility goals, and future uses.
- Compare conceptual foundation types against moisture, excavation, access, and coordination needs.
- Obtain survey, geotechnical, structural, floodplain, and permit input as applicable.
Formula or decision logic
Use a constraint matrix rather than a universal ranking. Eliminate concepts that conflict with verified flood, frost, soil, slope, access, or building requirements. Compare the remaining concepts on excavation, drainage, enclosure, service access, embodied material, schedule, and local contractor capability.
Worked planning example
A flat concept plan could use a slab, crawlspace, or basement geometrically. If the parcel lies in a mapped flood hazard area and has compressible soil, those conditions dominate the selection. The quantity calculator can still estimate a hypothetical slab volume, but the result cannot recommend that assembly.
Limitations and review boundary
- No bearing capacity, settlement, uplift, lateral, or reinforcement design is performed.
- Mapped hazards and site observations are not substitutes for site-specific investigation.
- The local building official and qualified designers control approval.
Primary sources
- 2024 International Residential Code: FoundationsInternational Code Council; accessed 2026-08-02. Source scope may differ from this project.
- Flood-Resistant Provisions of the 2024 International CodesFederal Emergency Management Agency; accessed 2026-08-02. Source scope may differ from this project.
Continue in construction systems
Wall and framing planning boundaries
Estimate layout quantities while keeping load paths, bracing, fire, moisture, and member sizing visible as unresolved design work.
Read guideCoordinate floor systems with the plan
Keep spans, supports, openings, levels, vibration, moisture, and services connected to room decisions.
Read guideRoof geometry, area, and coordination
Model slope and plan area for early quantities while separating geometry from structural and weather design.